How subterranean termites are controlled
- Pre-construction. Foundation trenches, v-channels and the area under solid floors are drenched with a termiticide according to label directions.
- Post-construction. The structure is drilled through the outside perimeter wall to reach below the floor slab, and a solution of termiticide is then injected according to label directions.
- Nests. Holes are drilled into the nest and the nest is flooded with a termiticide solution, at the rate the nest size and product label call for.
Harvester termites
Harvester termites build shallow nests rather than deep mounds. Control involves establishing where the shallow nests are and injecting a termiticide solution into the numerous nests. The surface area around the nests must also be treated, because harvester termites strip the surrounding vegetation and carry the clippings down into the nests.
Dry-wood termites
Control of dry-wood termites is accomplished by encasing the entire structure in gas-proof plastic sheeting and then introducing a fumigant for the exposure period the product calls for. If this is not possible, the infested timber must be replaced with new pre-treated timber, and the remaining structural timber must be drilled at regular intervals and pressure-injected with a registered wood preservative.
Pre-construction termite treatment
Pre-construction treatments are available for new construction homes, additions, garages, offices and other industrial and commercial buildings. The pre-treat is performed once the foundation, blocks and backfill have been completed, and it creates a preventative and protective barrier against possible future termite infestations.
Post-construction termite treatment
Post-construction termite treatments are an option for homeowners and business owners after the building is finished. The soil surrounding the building is treated as a protective barrier against termites that may pass through or under the treated soil areas.